Largest high school in the state. Built by CM Company and Designed by Hummel Architects.
This facility houses a 600 student alternative high school and includes parking, an instruction greenhouse...
This new credit union was built to replace the existing branch which opened in Boise in 1985.
This project is a 3-building office/retail complex located in Parkcenter Office Park in Boise.
This project is a five story, 85,000 square foot first-class office building. The building has a 45,000 sqf. plaza.
CM Company, Inc. was retained by the Meridian School District to construct a 85,235 square foot single story school
The project is a 1-story, load bearing masonry and structural steel building, which houses classrooms...
St Luke's Family Health medical offices.
St Luke's Physician Offices Addition.
Saint Mary’s was founded in 1937 as the city of Boise began to grow too large for just the cathedral parish.
The Boise project consisted of a complete interior and exterior renovation. The Vancouver project was a new hotel.
CM Company has constructed four Residence Inn Hotel projects for this owner, since 1986.
Through Capital Campaigns the Treasure Valley Family YMCA is growing throughout the Treasure Valley and beyond.
Idaho Central Credit Union Branches. Built by CM Company.
The longest continuously operating Synagogue located west of the Mississippi.
Built on one of the busiest intersections in the State of Idaho, Capital Blvd & Idaho Street, Boise
The Zoo Boise's New Home for the Giraffes, Lions and other exotic animals, native to the African Plains.
The original wood floor was retained and protected while the old roof was removed & replaced.
Siena Elementary School was completed in only 8 months! Record time for a project of this magnitude.
This new school was built 30 ft from the existing, occupied school, during the school year.
Replacing Wilder's Holmes Elementary with a new 2600 SQ FT Elementary School
Incorporating the needs of the tenant into the existing building characteristics, just in time for tax season.
Teaming with TrICA and Erstad Architects to rejuvenate the Historic Emmanuel Methodist Episcopal Church.
Scheduled for completion in August 2010!
This Hillsboro hotel is a 155 suite, 3-story wood framed structure.
This project, “a shopping paradise,” is a 58,269 square foot new prototype Albertsons Food Center.
13,000 sq.ft. building, Constructed in 7 months.