CM Company worked closely with Inn Ventures to build this 255 suite, 9-story hotel.
CM Company is teaming with the Vision Charter School & Erstad Architects, in the construction of a 23,000 SF School
Single story, structural steel & CMU construction including site development and landscaping.
The ILC project provides a flexible setting for classroom based instruction that connect teaching and technology.
Read about the Rejuvenation of this 100 year old school!
7,800 sf Engineered Steel Building for Proffessional Technical Education
The Garden Valley community passed a bond to build a new library in Garden Valley, Idaho.
Ontario School District 8C successfully passed an $18.5 Million Dollar Bond for Capitol Improvements.
13,000 sq.ft. building, Constructed in 7 months.
This project, “a shopping paradise,” is a 58,269 square foot new prototype Albertsons Food Center.
This Hillsboro hotel is a 155 suite, 3-story wood framed structure.
Scheduled for completion in August 2010!
Teaming with TrICA and Erstad Architects to rejuvenate the Historic Emmanuel Methodist Episcopal Church.
Incorporating the needs of the tenant into the existing building characteristics, just in time for tax season.
Replacing Wilder's Holmes Elementary with a new 2600 SQ FT Elementary School
This new school was built 30 ft from the existing, occupied school, during the school year.
Siena Elementary School was completed in only 8 months! Record time for a project of this magnitude.
The original wood floor was retained and protected while the old roof was removed & replaced.
The Zoo Boise's New Home for the Giraffes, Lions and other exotic animals, native to the African Plains.
Built on one of the busiest intersections in the State of Idaho, Capital Blvd & Idaho Street, Boise
The longest continuously operating Synagogue located west of the Mississippi.
Idaho Central Credit Union Branches. Built by CM Company.
Through Capital Campaigns the Treasure Valley Family YMCA is growing throughout the Treasure Valley and beyond.
CM Company has constructed four Residence Inn Hotel projects for this owner, since 1986.
The Boise project consisted of a complete interior and exterior renovation. The Vancouver project was a new hotel.
Saint Mary’s was founded in 1937 as the city of Boise began to grow too large for just the cathedral parish.
St Luke's Physician Offices Addition.
St Luke's Family Health medical offices.
The project is a 1-story, load bearing masonry and structural steel building, which houses classrooms...
CM Company, Inc. was retained by the Meridian School District to construct a 85,235 square foot single story school
This project is a five story, 85,000 square foot first-class office building. The building has a 45,000 sqf. plaza.
This project is a 3-building office/retail complex located in Parkcenter Office Park in Boise.
This new credit union was built to replace the existing branch which opened in Boise in 1985.
This facility houses a 600 student alternative high school and includes parking, an instruction greenhouse...
Largest high school in the state. Built by CM Company and Designed by Hummel Architects.